Thursday
ROUGH - Major Assignment
SITE VISIT - UNDER CONSTRUCTION.
with Tajana Dabic and Fiona Lofthouse
In both of these photo's, we can see the steel reinforcement for the UC (easy tube -seen below) secured into a footing of some sort (can not tell by the picture, although almost certain a pad footing) and then covered by a slab of concrete to create the floor. The walls and also visibly made out of preformed concrete panels and secures into place. Most likely with a rigid plate connection.
EASY TUBE
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment